Specialty Solar EPC

Started as a separate wing of the Energy24by7, our solar EPC team has completed installation of more than 550 kW of rooftop installations in South India just over the last 2 years. Annual Maintenance contracts for around 1MW of rooftop installations were also obtained over this short period of time.
solar cells system on the green world 3d rendering
man2-worker-firld-by-solar-panels

Steps involved in going solar with Energy24by7

Step 1
Site inspection for feasibility study of solar installation.
Step 2
Proposal submission based on customer demands
Step 3
Procurement of materials
Step 4
Design of power plant and installation
Step 5
Statutory documentation as required by law
Step 6
Switching on power plant